The MGA Restoration Project
Page Thirty Seven: Fitting the Top
|
---|
The top retaining plates and lift-the-dot fastener studs are installed on the
tonneau.
|
The top frame, painted tan, is also installed. One of the several wooden
components of the MGA, the front bow or "hoodstick" is visible here.
|
At Sure-Fit Seat Covers just down South Tacoma Way from Brooklands, the top is
being fit.
|
The fabric cover is fixed to the front bow, and the top will soon be attached
to it.
|
Back at Brooklands, the MG looks jaunty with its freshly fitted top.
|
Can't wait to hit the road!
|
Back to Page Thirty Six
On to Page Thirty Eight
COPYRIGHT © 2004